Solar Panels Part 2
The conduit got laid and the inspector signed off of the work. Ben hired a local guy to come out and scrape the soil back where the panels will go. He also laid gravel down. Ben installed all the racks and secured them.
The weather has been absolutely crazy this year. It was 66 degrees on Christmas day! That is unheard of here! Ben has been making the most of it by getting up as much of the solar array as possible. Today Ben's brother and a friend of ours came over to help carry and install half of the panels.
The other half will have to wait until after we get back from vacation and the weather cooperates.



Comments
Post a Comment